Engineers at HERWIT have been planning and designing electrical cogeneration systems utilizing digester gas for over 12 years.  Mr. Harris has planned and designed over 3 megawatts of cogeneration systems and retrofitted other existing systems.  He has also authored a paper on scrubbing digester gas using water only and presented this paper at a National Wastewater Conference.
P2140007.JPG (462512 bytes)

P2140017.JPG (454037 bytes)

RIMG0213.JPG (620544 bytes)

P4050015.JPG (459911 bytes)

RIMG0213.JPG (620544 bytes)

RIMG0207.JPG (616448 bytes)

The facilities designs have included all ancillary systems such as:

  • Heat recovery systems (steam and hot water)

  • Floating Piston gas storage systems

  • Flexible Membrane gas storage systems

  • Fixed Cover gas storage systems

  • Regenerative Gas blowers

  • Enclosed Stainless Steel gas blowers

  • Piston gas compressor systems

  • Sliding vane gas compressor systems

  • Gas Flares

  • Sulfur control facilities

  • Gas optimization and control systems

  • Standby Generator interface controls

  • Electrical Parallel Bus system controls

Work performed includes:

  • Air Permitting

  • Electric Utility rate negotiations

  • Feasibility studies

  • Energy Audits of existing treatment plants

  • Diagnostic trouble shooting of existing systems

  • Conversion of existing systems to lower emissions standards

  • Integration of engines with process blowers systems

  • Construction management

  • System start up and debugging

P2140009.JPG (459508 bytes)

P2140015.JPG (463631 bytes)

In total, these designs have saved project Owners over $4 million in offset energy costs. 

 

 

 

 

 

 

 